top of page

Hi There!....
I’m Yasser Ali Habib

Explore and Enjoy

Home: Welcome

About Me

          Yasser is a highly motivated and dedicated person, with good engineering
professional communication skills. I have more than 15 years of contracting and projects management experience through working in different type of organizations along all the project processes starting from kicking off, planning, execution, monitoring, testing / commissioning and handing over with client satisfaction.


          I'm experienced on a diverse range of high quality projects, and mega projects including and not limited to, high-raise buildings (sky scrapers), hospitals, pump stations, substations, power plants, desalination plants, community villas, Commercial, institutional and Industrial developments.


          I'mSeeking a challenging career with a progressive organization that provides an opportunity to capitalize my technical skills and knowledge in the field of Construction, in order to grow along with the organization and contribute towards achieving its goals.

Get in Touch
20161226_145908-min.jpg
Home: About Me

My Experience

Background & Expertise

Construction Manager at : LBC, Lootah Building & Construction;                                                             UAE

June 2018 – present

          Managing overall construction processes for Lootah Apartments Tower 2B+G+26 Floors rise building in Motor City / Dubai, in addition to taking the responsibility to finalize the TOC taking over certificate from Dubai Municipality for the project of 234 Villas located in Al Quz and Oud Mutteina / Dubai.

Construction Manager at : ACC, Arabian Construction Company;                                                              KSA

Dec. 2012 – June 2018

Project                :Jabal Omar Development Project (JODP III) in MAKKA 4 High Rise Towers (4B,G,45 floors) + 12 plates (Podium).
Location             :KSA- MAKKA - AL Haram Central Area, third phase.
Main Contractor :JV of ACC / Drake and Scull construction
Project Client      :Jabal Omar Development Company
Project Manager :Hill International
Main Consultant :ARCREA Studio & Associated Engineers Company
Urban Designers : Lion Associes and Ingerop
Supervision Consultant :Khatib and Alami KAA & ECG


              Jabal Omar is a luxurious mega project comprises 37 high-rise hotels, podiums, besides its mega landscaping and internal mega infrastructures.
             The third phase of Jabal Omar project that adjacent to Al Masjid AL Haram of Makkah (JABAL OMAR DEVELOPMENT PROJECT PHASE III) which involved two zones N01 and N06A with a built-up area of approximately 412,000 M2 consisting of 2 Podiums divided into 12 plates with four luxurious hotels (Hilton & Double tree).

             The Podiums will embed commercial and retail areas, car parks, hotel lobbies and technical areas. The tallest Twin Towers with 45 floors (Makkah Gate) are a 5 stars hotel later operated by Hilton, while the other Twin with 35 floors towers are 4 stars hotel to be operated by Double Tree.

             The Hilton Twin Towers shall be linked by a 2 floors steel structure sky-bridge to be used as a "Musallah" or Prayer Hall overlooking Al Masjid Al Haram With free height of 170 M and free simply supported length 50 m and 15 M width. 

            Moreover, the two Podiums are connected by an underground tunnel below a pedestrian boulevard of 600m length connected directly with Haram for easy passage between the hotels and Haram on foot and covered structurally by hollow core precast slab. the project was awarded by SAR 2.7 bn.

Senior Section Engineer (Project Engineer) at : ACC, Arabian Construction Company;                UAE

October 2010 – Nov. 2012

Project                :Strategic Water Storage Recovery Project in Liwa (SWSRP), huge Industrial & infra-structure project.
Location             :UAE - Abu Dhabi - Western Area
Main Contractor : JV of ACC and South Korean POSCO
Project Client      : (ADWEA) Abu Dhabi Water and Electricity Authority
Full EPC             : JV of ACC and Korean POSCO Engineering and Work
Supervisor         : Deutsche Gesellschaft fur Internationale Zusammenarbeit GmbH (GIZ), Dornier Consulting GmbH (DCo), Transco, (EAD) Environmental Agency of Abu Dhabi.

​

            The Abu Dhabi Water and Electricity Authority (ADWEA) and the Environment Agency (EAD) have awarded a Dhs 1.6 bn mega project contract for the engineering, procurement and construction (EPC) of the world’s largest strategic water project to a joint venture between Arabian Construction Company (ACC) and POSCO Engineering & Construction Co (POSCO).

           That project is the first of its kind in the Middle East. It will consist of an underground water aquifer storage facility with a capacity of 27 million Cubic Meter of Desalinated Water (Potable water) and being stored at -85.00 meters below ground Level in the Liwa desert for use "in the event of a water emergency.
          Major purpose of the ASR-plant (Aquifer Storage and Recovery) is the infiltration and storage of (27X106 M3) in a shallow dune sand aquifer located in the Western Region of Abu Dhabi (LIWA) and subsequent recovery of the infiltrated DSW (Discharge to Surface Water) using 442 wells with depth of -90 M, and then pumped for emergency to Abu Dhabi City.
Full scope comprises:
4 RC Pumping Stations covered by trussed steel structure.
3 Circular Steel Structure Water Tanks with 35 M Dia. above RC Ring Beam.
442 Water Wells of 90 M deep / Various Dia with top Well Head Champer,
110 KM of 1200MM Dia. Carbon Steel Pipe laying;
54 KM of 900MM Dia. CS piping laying;
HDPE pipe network through the aquifer;
Hydrogeological and Groundwater monitoring of the aquifer;
Geophysical logging of the wells,
Huge amounts of excavation, backfilling, leveling and other infrastructures activities.

Section Engineer (Project Engineer) at : ACC, Arabian Construction Company;                                 UAE

April 2010 - October 2010

Project                          : Etihad Towers (5B + G + 76 storeys)
Location                        : UAE - Abu Dhabi City
Main Contractor            : ACC (ARABIAN CONSTRUCTION COMPANY)
Project Client                 : H.H. SH. Suroor AL Nahian
Project MNGNT             : Hill International
Supervision Consultant : (AECOM)
Architectural Design      : DBI, The Australian International design consultant


             An 1.7 billion US dollars mixed-use development With Area 500,000 m2 Comprising five high rise towers ranging from 54 to 76 floors exceeding 300 meters Height with large multi five levels podium and four level underground parking with a capacity of more than 3200 cars. The towers include a high-end hotel with a capacity of 600 rooms, as well as 900 residential apartments, and 65,000 square meters of office space and includes as well eight unique restaurants, a large ballroom, as well as a private beach with luxurious landscape. The project is a real landmark in Abu Dhabi skyline.

Section Engineer (Project Engineer) at : ACC, Arabian Construction Company;                                 UAE

Nov. 2009 - March 2010

Project                 : Abu Dhabi Central Market (World Trade Center of Abu Dhabi)
Location              : UAE - Abu Dhabi City
Main Contractor  : A CC (ARABIAN CONSTRUCTION COMPANY)
Project Client      : A ldar Properties PJSC
Main Consultant : Foster & Partners

         


          Central Market Redevelopment Project in Abu Dhabi comprises 3 high rise skyscrapers that varies from 58 to 99 storeys with a built up area of 560 000 sq.
          The 99 story residential tower is 382 meters high and considered the highest building in Abu Dhabi,and the overall redevelopment comprises apartments, an Arabian souk, branded retail outlets, grade A office space, world class hotels, and parking for in excess of 5,250 cars.

​

Project Manager at : Nile Falcon for Trade and Contracting;                                                                           UAE

March 2008 –May 2010


Location              : UAE - Abu Dhabi City

​

          My Role was Project Manager for several Projects simultaneously with different Consultants and
Clients and was assisted by project and Site Engineers as Follows:
ļ‚· Building with 1 Basement + G + M + 12 typical + Roof located at Abu Dhabi H.H. Mohammad bin Rashid Road.
ļ‚· Villa compound: 12 Villas with health club and landscape + substation located at Abu Dhabi H.H. 1rst Zayed Road.
ļ‚· Villa compound: 8 Villas with landscape and swimming pool located at Khalifa City "A".
          I have also participated during tender stage and cost analysis before awarding some projects. And managing the projects kick off meetings, preparing full site setup plan and obtain construction permits from authorized aspects.

Project Manager at : Al Faisal General Contracting Contracting;                                                                 UAE

July 2007 - Feb 2008


Location              : UAE - Abu Dhabi City

​

        My Role was Project Manager for several Projects simultaneously with different Consultants and Clients and was assisted by project Engineers as Follows:
ļ‚· Villa compound: 8 Villas with landscape and swimming pool at Khalifa City "A".
ļ‚· Villa compound: 6 Villas with landscape at Khalifa City "A".
ļ‚· Private Palace with luxurious finishing  and Details Khalifa City ā€œA".

Project Manager at : Teriyadh for General Contracting;                                                                                    KSA

Feb 2004 - May 2007

**Project 3        : G+15 storeys building
Location           : KSA – Riyadh

Position            : Construction Manager
Responsibility   : Construction Manager for all finishing Activities.

**Project 2        : 200 villas Compound for H.H. Prince Walid Bin Talal Al Saud
Location           : KSA – Riyadh - Al Hair
Position            : Deputy Project Manager

Responsibility  : responsible for 200 Villas Fast Track Project assisted by 2 project Engineers and 4 site Engineers including all the necessary services from car parks and water tanks.


**Project 1       : 200 villas Compound for H.H. Prince Walid Bin Talal Al Saud
Location          : ARAR (KSA North Border)
Position           : Project Engineer
Responsibility : responsible for 106 Villas from A to Z Fast Track Project assisted by 2site Engineers, including all the necessary services from car parks and water tanks.

Assistant Resident Engineer : Prof. Ahmad Farid Hamza Engineering and Consultancy;             ARE

Feb. 2003 – Jan. 2004

Location              : EGYPT – Mansoura University Specialist Hospitals.
Project                : Mansoura University Oncology Center Hospital "High rise"
Main Contractor : Al Abd for General Contracting


Responsibilities  :
1- General supervision of the construction including, testing, examination of materials and workmanship, measurement of work carried out and issue of certificates to the Contractor with respect to delegation of power given by the Employer, Prepare all required reports to all parties.
2- Ensure the implementation of construction quality controls including testing, inspection, and acceptance of materials testing and commissioning.
3- Keep the Employer informed of site related matters through weekly meetings and regular monthly reporting and Assist in the enforcement of approved project health, safety, security and environmental control plans.
4- Manage structural Construction records including drawings, specifications and contract documents, Support the Employer in making decisions on construction elated issues and Participate in the final inspection, testing, commissioning and final handing over of the works.

Site / Sr. Site Engineer at : Arabian Establishment for Trade and G. Contracting;                             ARE

June 2001 – Jan. 2003

** Project 2           : Sewage project in Dakahlia - Sherbin.

Location           : EGYPT – Dakahlia – Sherbin
Client                : Ministry of local Development

Responsibilities: Assist Project Manager to execute works as per Specs and supervise all trades and subcontractors, the project includes Sewage Lines, Sewage treatment Plant, RC Culvers and Tanks.


** Project 1        : The development of secondary school of agriculture.
Location            : EGYPT – Dakahlia – Talkha
Client                 : Educational Buildings Authority (EBA)
Responsibilities: Assist Project Manager to execute works as per EBA Specs and supervise all trades and subcontractors for concrete and Finishing Works.

Home: Experience

My Major Recent Projects

,

Home: Projects

High rise Luxurious Hotels

Th Hilton, In Makkah / KSA

​

       Jabal Omar Mega project in Makkah, comprises 37 high rise luxurious Hotels like Hilton, Sheraton, Mariot, Hayyat, and others. Besides these Hotels there are big infrastructure and landscaping scopes.

​

I was responsible for an Hilton tower with 6B + G + 5 floors Podium + 45 typical floors.

​

Project was reported by Al Arabia, you can enjoy the report by the this URL; https://www.youtube.com/watch?v=UTeEw_q5K2c

2014-04-28 11.09.53.jpg

Education

Let's browse my Educacation Timeline;

B.Sc from Mansoura University

SeptemberĀ 1996 - June 2001

          I've graduated in 2001 as a Civil Engineer from Mansoura University- Egypt, although engineering courses are boring and difficult I spend interesting five years with respected Professors and smart colleagues. My Graduation Project was about the design and characteristics of different Reinforced concrete structures such as and not limited to high rise building subjected to lateral loads, wide area dome, and frames,....etc.

High SchoolĀ  from M.S.S. in Mansoura

September 1993-June 1996

          I had my high school certificate from M.S.S. Military Secondary School of Mansoura. It was my beautiful days to start my life as a man not a boy, I made a lot of nice friends and I called this period as the personality building stage. Regarding studying i studied common advanced sciences like chemistry, biology, physics, math, statistics and languages including french as a second selective foreign languages to study.  

Al Galaa Pripary School

September 1990 - June 1994

         In Al Galaa Pripary School, it was my first time to recognize that there is a big difference between friends and classmates, and start to build my ability to distinguish between the bad and good friends, not such like primary stage, in which I considered all were friends and almost the same and all were Good. For materials I studied were modern Science, Math, Social, Geo-graphics, and start to learn English as a mandatory first foreign language.

Mahmoud Sa'id Primary School

September 1984 - June 1990

          It was my first time to learn, reading, writing, and start calculating, I had amazing unforgettable thoughts and lovely friends from both sexes, there was no limitations in our relationships, I definitely enjoyed my primary stage. 

parents Caring

Zero Age - September 1984

         Fortunately, I didn't join any Kindergarten, but thanks to Allah I was granted unique parents who I'm thankful all time, they taught me basics, etiquette, and how to gain and pay respect.

In addition to the aforementioned, my parents especially Mum, learned me how to read, write calculate and coloring. Before I joined my primary school I was able to read, write, count till million.

          I need to Seize the moment, to express gratitude to my parents and lovely brothers who supported me along my timeline, and the reason to be the one to have this nice biography.

Home: Education

My Skills

What I Do

08032012(6)-min.jpg

Team Leader

Team leader, dedicated, motivated, worked on several construction projects using latest engineering technologies and good engineering negotiator.

attach.jpg

Multicultural

Able to work and grow in a multi-cultural team effectively, and open to different
opinions.

PC Skills

PC skills, well versed with customized Engineering Software, like Autocad, Primavera, M.S. Package, M.S. Project, Eatb, Sap, CSI, Reivt, Aconex,...etc.

laptop.jpg

HSE

Follow up and implement Safety procedures, to ensure Zero Accident and
compliance by all site personnel, with taking necessary disciplinary actions against
any person fail to adhere to safety requirements and Take necessary actions in case
of any incident.

safety.jpg
19012013-min.jpg

Comunication

Communicates regularly and effectively with company colleagues and other relevant disciplines to improve skills by discussing and providing solutions to overcome problems repetition at different areas and stages of construction process.

municipality.png

Membership

** Dubai Municipality for Buildings with Un-Limited Floors

​

** Saudi Council of Engineers

​

** Egyptian Engineers Syndicate.

Driveng License

Valid Driveng Licenses for:

UAE ,

KSA ,

Egypt.

20180718_102355.jpg

Personality

I'm a highly motivated and dedicated person, with more than 15 years of contracting and projects management experience in different type of organizations along all project processes/stages.

IMG-20160405-WA0010-min.jpg
Home: Skills

"If you want something you've never had, you must be willing to do something you've never done"

Thomas Jefferson

Home: Quote

Let’s Connect

Dubai - United Arab Emirates

00971 52 703 4826

20151229_145256-min_edited.jpg
Home: Contact
  • facebook
  • twitter
  • linkedin
  • generic-social-link
  • generic-social-link

©2019 by Yasser Ali Habib. Proudly created with Wix.com

bottom of page